What you are actually buying
A Lake Lanier waterfront home is three purchases in one: a private lot, the use of the public shoreline in front of it under Corps rules, and a dock that needs a permit in your name. Step through the cross-section to see where each line falls.
Where a lakefront lot ends
Five lines decide what you are actually buying.
Step through the cross-section. Each line comes from the Corps’ own documents, with the link to check it.
1 The deed usually stops short of the water
The U.S. government (the Army Corps of Engineers) owns most of the land around Lake Lanier outright, in fee title. On most 'lakefront' lots the private property line stops at the Corps boundary, not at the water.
Source: U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Find the lines on a survey2 The shore belongs to the public
Private property lines do not extend onto Corps land. Owning the lot next to it gives no special rights on government property, no guaranteed privacy and no exclusive use of the shoreline.
Source: U.S. Army Corps of Engineers (archived page), checked 2026-10-19
How the shoreline is zoned3 1,071 feet is full, and the lake moves
Lake Lanier's full level is 1,071 feet above mean sea level. The Corps calls 1,070 feet winter pool.
Source: U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Water levels for buyers4 The flood line can cross private land
When Buford Dam was built, the government set a maximum flood elevation of 1,085 feet above mean sea level. Where that line fell on private land, it bought flowage easements. That land stays private, but the owner may not build habitable structures on it or change its contour. All purchased easements are recorded.
Source: U.S. Army Corps of Engineers (archived page), checked 2026-10-19
The 1,085-foot line5 The dock is a permit, and it ends at the sale
Dock permits cannot be transferred. They become null and void when the property is sold or transferred, or when the permit holder dies. New owners must tell the Corps of their purchase and apply for a new permit.
Source: U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Dock permits for buyers
Two lines that frame every lake lot
- The U.S. government (the Army Corps of Engineers) owns most of the land around Lake Lanier outright, in fee title. On most 'lakefront' lots the private property line stops at the Corps boundary, not at the water. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- Lake Lanier's full level is 1,071 feet above mean sea level. The Corps calls 1,070 feet winter pool. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Is it smart to buy a lake house? Start with the downsides
A lake home can be a sound purchase, but it carries obligations an inland buyer never meets. Weigh these before you fall for a view.
- Rules on land you do not own. The shoreline in front of the house is public, and clearing, planting or placing things there needs Corps permission first.
- A dock you have to apply for. The seller’s permit ends at the sale, and the Corps inspects before it issues yours.
- A lake that moves. The level runs highest in spring and lowest in the fall, and it falls much further in a drought.
- Limits on building and septic. Where a flowage easement crosses the lot, no living space and no new septic system can go below the line.
- Five counties, five rule books. Taxes, homestead deadlines, septic offices and rental rules change at the county line, and the parcel record decides which county you are in, not the mailing city.
The downsides, from the source
- A permit is required before any work on Corps property. The Corps lists clearing trees and understory, planting non-native or ornamental plants, placing unpermitted items (swings, picnic tables, benches, sheds, boat trailers) and grading among prohibited acts. Violators face fines up to $5,000, up to six months in jail, restitution, restoration or permit revocation. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- In Corps daily readings since 1980, the median lake level runs highest in April-May (about 1,070.8 to 1,070.9 feet) and lowest in October-November (about 1,064.9 to 1,065.4 feet). In a dry year (10th percentile), November-December readings have been near 1,056.7 feet. Corps of Engineers, Mobile District, checked 2026-10-19
- The Corps says the record low was 1,050.79 feet in December 2007, about 20 feet below full. Corps daily records show that reading at midnight on Dec. 26, 2007. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- Lake Lanier's mapped shoreline lies in five Georgia counties: Hall (by far the most), Forsyth, Dawson, Gwinnett (only near Buford Dam) and Lumpkin (only the head of the Chestatee arm). U.S. Census Bureau TIGERweb, checked 2026-10-19
None of these is a reason not to buy. Each is a reason to check before you offer, in the order below.
Step 1: before you make an offer
These checks cost little or nothing and can change what you offer, or whether you offer at all.
Confirm the county from the parcel record
The county decides the tax bill, the school district, the septic office and the rental rules, and on Lake Lanier the mailing city does not tell you which county you are in.
Port Royale Marina has a Gainesville mailing address, but the Census Geocoder places that address in Forsyth County, not Hall. Mailing city is not a guide to county on Lake Lanier. (U.S. Census Bureau Geocoder, checked 2026-10-19)
Look the parcel up in the county’s own records, and see property taxes by county for what changes at each line. For schools, check the district’s lookup for that address.
Ask the Corps about the shoreline in front of the lot
To learn a lot's shoreline zoning, the 2004 plan points to the allocation map pages at the Corps Operations Manager's office (the plan also cites gis.sam.usace.army.mil). In practice the area ranger confirms it at the required on-site appointment. (U.S. Army Corps of Engineers (archived page), checked 2026-10-19)
If the home has no dock and you want one, this is the first call, not the last. See Lake Lanier shoreline zoning.
Get the seller’s dock permit number
What the Corps tells buyers
- The Corps says there is no such thing as a permit 'in good standing': a permit is either active or expired. A buyer can call the Shoreline Help Desk or area ranger for general information about a dock, but privacy rules limit what the Corps can share. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- The Corps warns buyers ('Buyer be ware!') that a real estate agent has no authority to approve anything about Lake Lanier permits. If the seller or an agent made unapproved changes to the dock or shoreline, the buyer may be required to correct them. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Ask for the permit number, any Corps letters, and a plain answer on whether anything at the dock or on the shoreline was changed without approval. Then call the Shoreline Help Desk. The dock permit guide for buyers has the questions to ask, and does a Lake Lanier dock permit transfer answers the most common one.
Look up the flood map
FEMA's Flood Map Service Center (msc.fema.gov) is the official public source for National Flood Insurance Program flood hazard information. You can search an address there to find the effective flood map. FEMA says maps are updated over time, so a printed map can be superseded. (FEMA, checked 2026-10-19)
Search the address on FEMA’s Flood Map Service Center, and read flood zones and insurance before you ask for quotes.
Step 2: during due diligence
These depend on the seller and on other offices, and they take days. Put them inside your due-diligence period, while you can still walk away.
The survey and the 1,085-foot line
Lines on the survey
- When Buford Dam was built, the government set a maximum flood elevation of 1,085 feet above mean sea level. Where that line fell on private land, it bought flowage easements. That land stays private, but the owner may not build habitable structures on it or change its contour. All purchased easements are recorded. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- Painted 'witness trees' only signal that the Corps line is nearby; they are not the exact line. If you need to know exactly where the line is, the Corps says to hire a private registered land surveyor. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Ask for the recorded survey or plat, and have the title work checked for a flowage easement. See the 1,085-foot line.
Septic or sewer
Corps policy: septic tanks and drain fields are not permitted on public (Corps) land below 1,085 feet, whatever their age, and existing ones there must be removed. The plan also says local health officials prohibit new septic systems below the 1,085-foot contour regardless of who owns the land. (U.S. Army Corps of Engineers (archived page), checked 2026-10-19)
Confirm the wastewater system from a bill or a county record, never from a listing remark. The septic and sewer guide names the office for each county, and septic below the 1,085 line covers the hard case.
Dock depth and the lake level
Depth rules
- The 2004 plan requires six feet of water under the lakeside or slip end of a dock (at full pool, per Section 15.3.4), and says that requirement is subject to change. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- During low water, docks may be moved to follow the receding shoreline if one-third of the channel stays open and they do not cross neighbors or move into Protected or Recreation shoreline. Digging, leveling or changing the lakebed contour without a permit is prohibited. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Measure the depth at the slip end, note the date, and run it through the dock-depth planner. The water-level guide explains the record behind it, and dock depth in a drought shows what a dry year does.
The dock’s electrical service
Dock electrical
- All dock electrical service on Corps land must have ground-fault (GFI) protection and be buried, regardless of age or grandfathered status. Electrical recertification is required at each permit renewal, at each change of ownership, and whenever an inspection finds the service out of compliance. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- The Corps' Lake Lanier electrical contractors list says all electrical installations must be approved by the Corps and inspected by a Georgia-licensed electrician, and must meet Corps specifications and the National Electrical Code. The Corps does not recommend contractors. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
If the permit includes electrical service, the Corps no longer uses its Exhibit C form. Ask for a letter from a Georgia-licensed electrical contractor certifying the service meets the National Electrical Code, and have that electrician look at the service before closing.
If you plan to rent
Only one dock permit is allowed per household. Permits are not issued for speculation, to enhance private property, to people renting the property, or to minors; the permit holder must own and be the main user of the dock. (U.S. Army Corps of Engineers (archived page), checked 2026-10-19)
Short-term rental rules differ by county. Read the shore guide for your county and ask the county before you count on rental income.
Step 3: before closing
Settle who pays this year’s property tax in the contract, and do not estimate your future tax bill from the seller’s.
Taxes in the year you buy
- In Georgia, property tax is charged to whoever owned the property on January 1 of the tax year. How a year's tax is split between buyer and seller at closing is a contract and closing matter. Georgia Dept. of Revenue, checked 2026-10-19
- Under the statewide floating homestead exemption, a home's taxable value resets to fair market value when it sells, and substantial improvements are added to the value. A buyer does not inherit the seller's capped value. Georgia Municipal Association, checked 2026-10-19
Gather what the Corps will ask the new owner for, so you can file as soon as the deed records.
For the change-of-owner process the Corps asks for, all at once: the recorded deed with its tax stamp (not a security deed), the current recorded survey or plat with boundary information, your own hand drawing of the dock with all dimensions, a hand-drawn site map, the electrical certification if the permit requires one, and proof of authority for a company, trust, estate, HOA or LLC (and any power of attorney). County aerials, Google maps, the previous owner's drawings and photos are not accepted. (U.S. Army Corps of Engineers (archived page), checked 2026-10-19)
Step 4: after you own it
The permit work starts the day the deed changes hands. Until the Corps has written back, leave the dock and the shoreline as they are.
The new owner’s steps
- The Corps' welcome letter to buyers says the dock permit expired the day the name on the deed changed, and tells new owners not to install or change facilities or cut vegetation or trees until they contact the office and get written permission. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- After the documents arrive, the area ranger inspects the dock and shoreline for deficiencies and violations under the Shoreline Management Plan and 36 CFR 327. The applicant must be one person named on the newest recorded deed. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
- The Corps estimates about 6 to 8 weeks to evaluate and process a permit application once it has the complete package. U.S. Army Corps of Engineers (archived page), checked 2026-10-19
File for your homestead exemption too. It is not automatic, and each county sets its own deadline.
Georgia's homestead exemption generally requires that you owned the home and it was your legal residence on January 1 of the tax year. If you close after January 1, the exemption for your new home starts the next tax year. (Georgia Dept. of Revenue, checked 2026-10-19)
The taxes page has each county’s deadline and office.
Run the checker on the home you like
The checker narrows these steps to the ones that apply to one home or lot: its county, its dock, its wastewater, the 1,085 line and how you will use it.
Decision tool
Waterfront due-diligence checker
Tell us about the lake home or lot you are looking at. The list narrows to the checks that matter for it, each with the office to ask and the official source.
Before you make an offer free, and takes an afternoon
Confirm the county from the parcel record, not the mailing city
On Lake Lanier the mailing city is not a guide to the county, and the county sets the tax bill, schools and permits.
Who to ask: The county’s parcel search
U.S. Census Bureau Geocoder, checked 2026-10-19
Look up the parcel in Hall County
Hall points owners to qPublic for property records and assessed values.
Who to ask: Hall County (qPublic)
Hall County, checked 2026-10-19
Look up the parcel in Forsyth County
Forsyth points owners to qPublic for tax information and homestead status.
Who to ask: Forsyth County (qPublic)
Forsyth County, checked 2026-10-19
Look up the parcel in Dawson County
Dawson’s Tax Assessor links to qPublic and a tax estimator.
Who to ask: Dawson County (qPublic)
Dawson County, checked 2026-10-19
Look up the parcel in Lumpkin County
Lumpkin’s Assessor links to qPublic for property records.
Who to ask: Lumpkin County (qPublic)
Lumpkin County, checked 2026-10-19
Look up the parcel in Gwinnett County
Gwinnett’s Assessors link their property search to qPublic.
Who to ask: Gwinnett County (qPublic)
Gwinnett County Assessors' Office page, checked 2026-10-19
Ask the Corps how the shoreline in front of the lot is zoned
Private docks are possible only on Limited Development shoreline, and the ranger confirms the zoning at the site appointment.
Who to ask: Corps Lake Lanier office, Shoreline Help Desk
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Treat the dock as a permit question, not a feature
The Corps says there is no permit “in good standing”: it is active or expired, and privacy rules limit what it can tell a buyer.
Who to ask: The seller, then the Shoreline Help Desk
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Do not rely on an agent’s word about the dock
The Corps warns that a real estate agent has no authority over Lake Lanier permits, and a buyer may have to fix unapproved changes.
Who to ask: Corps Lake Lanier office
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Check the 82-foot frontage rule before you count on a new dock
A new private dock needs at least 82 feet of private land next to Limited Development shoreline.
Who to ask: Corps area ranger
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Know the dock cap and the wait-list
The plan caps private docks lake-wide; once the cap is reached, freed-up permits are released each March.
Who to ask: Corps Lake Lanier office
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Check the water depth at the dock against the lake-level record
Levels go up and down; the dock-depth planner shows how often the lake has fallen below your line.
Who to ask: Corps and USGS lake-level records
Corps of Engineers, Mobile District, checked 2026-10-19
Look up the flood map for the address
FEMA’s Flood Map Service Center is the official source for flood zones, and the zone drives insurance cost.
Who to ask: FEMA Flood Map Service Center
FEMA, checked 2026-10-19
During due diligence while you can still walk away
Find the 1,085-foot line on the survey
Below it, flowage-easement land stays private but cannot carry habitable structures or be regraded.
Who to ask: Your surveyor and closing attorney
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Hire a surveyor if the Corps line matters
Painted witness trees only show that the Corps line is nearby; the Corps says to use a registered land surveyor for the exact line.
Who to ask: A Georgia registered land surveyor
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Check whether a pre-2000 house sits over the line
The Home Preservation law covers homes built before 2000 on Corps land or in the easement; later encroachments can be removed.
Who to ask: Corps Lake Lanier office
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Look for items left on Corps land
Unpermitted items left on Corps land are encroachments the Corps can remove at the owner’s expense.
Who to ask: The seller; your walk-through
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Ask about septic below the 1,085 line
The Corps does not permit septic tanks or drain fields on its land below 1,085 feet, and health officials bar new systems below that line.
Who to ask: County Environmental Health
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Request the septic record (Hall)
Hall County Environmental Health sends a septic record by email request with the property address.
Who to ask: Hall County Environmental Health
Hall County, checked 2026-10-19
Ask Forsyth Environmental Health about the septic system
Septic permits in Forsyth County are handled by Forsyth County Environmental Health.
Who to ask: Forsyth County Environmental Health
Forsyth County Environmental Health, checked 2026-10-19
Get the septic record (Dawson)
District 2 Public Health keeps the records of approved septic systems at the county office.
Who to ask: Dawson County Environmental Health
Georgia DPH District 2, checked 2026-10-19
Request the septic record (Lumpkin)
Lumpkin County Environmental Health takes septic-record requests by email.
Who to ask: Lumpkin County Environmental Health
Lumpkin County, checked 2026-10-19
Read the water bill to tell sewer from septic (Gwinnett)
Gwinnett Water Resources says a sewer-use charge on the county water bill means public sewer.
Who to ask: Gwinnett Department of Water Resources
Gwinnett County, checked 2026-10-19
Check the county’s short-term rental rules (Hall)
Hall allows short-term rentals in residential districts with a license, caps occupancy, and the license does not transfer.
Who to ask: Hall County
Hall County, checked 2026-10-19
Check the county’s short-term rental rules (Forsyth)
Forsyth allows short-term rentals only in A1 or Ag-Res zoning with a conditional use permit.
Who to ask: Forsyth County
Forsyth County, checked 2026-10-19
Check the county’s short-term rental rules (Dawson)
Dawson requires a short-term rental permit for stays under 30 days.
Who to ask: Dawson County
Dawson County, checked 2026-10-19
Check the county’s short-term rental rules (Lumpkin)
Lumpkin requires a Land Use Permit before a short-term rental license.
Who to ask: Lumpkin County
Lumpkin County, checked 2026-10-19
Check the county’s short-term rental rules (Gwinnett)
Gwinnett’s development ordinance sets standards for rentals under 30 nights.
Who to ask: Gwinnett County
Gwinnett County, checked 2026-10-19
Know that a permit holder cannot rent out the dock
Dock permits are not issued to people renting the property, and moorage at a private dock may not be rented.
Who to ask: Corps Lake Lanier office
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Plan around the state-waters buffer before you build
Georgia’s buffer along lakes and reservoirs is measured from the wrested-vegetation line, and work inside it needs a variance.
Who to ask: Georgia EPD and the county
Georgia EPD, checked 2026-10-19
Get septic review before a building permit (Hall)
In unincorporated Hall, owners on septic must contact Environmental Health before applying for a construction permit.
Who to ask: Hall County Environmental Health
Hall County, checked 2026-10-19
Get septic review before a building permit (Forsyth)
Forsyth Environmental Health reviews septic before you build, remodel or add a pool.
Who to ask: Forsyth County Environmental Health
Forsyth County Environmental Health, checked 2026-10-19
Before closing
Agree in writing who pays this year’s property tax
In Georgia the owner on January 1 is charged the year’s tax; the closing documents decide who actually pays.
Who to ask: Your closing attorney
Georgia Dept. of Revenue, checked 2026-10-19
Expect the taxable value to reset after the sale (Hall)
Hall County says its floating and base-year homestead exemptions do not transfer when a home sells.
Who to ask: Hall County Tax Assessors
Hall County, checked 2026-10-19
Expect the school-tax cap to end at the sale (Forsyth)
Forsyth’s HB 717 school cap lasts only until the home is sold.
Who to ask: Forsyth County Board of Assessors
Forsyth County Schools, checked 2026-10-19
Expect a new base value (Gwinnett)
Gwinnett’s Value Offset Exemption freezes the value from the year that owner was granted homestead.
Who to ask: Gwinnett County Assessors
Gwinnett County, checked 2026-10-19
Line up the electrical recertification
Dock electrical recertification is required at each change of ownership.
Who to ask: A Georgia-licensed electrician
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Have the seller complete the Corps dock disposal/transfer form
The dock is private property but the permit is not; the Corps form names the new responsible party.
Who to ask: The seller and the Corps area ranger
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
After you own it
Do not change the dock or cut anything until the Corps answers
The Corps’ welcome letter says the permit expired when the deed changed, and asks new owners to wait for written permission.
Who to ask: Corps Lake Lanier office
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Send the change-of-owner documents all at once
The Corps asks for the recorded deed, the survey or plat, a drawing of the dock and a site drawing, among others.
Who to ask: Corps Lake Lanier office
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Expect the ranger to inspect the dock and shoreline
After the documents arrive the area ranger inspects for deficiencies and violations.
Who to ask: Your Corps area ranger
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Book the ranger site appointment for a new dock
A qualifying site is reserved for 90 days from the appointment; the application must arrive in that time.
Who to ask: Corps area ranger
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
Call the Corps before cutting any tree on its land
Even a dead or leaning tree on Corps land needs the Corps first; unpermitted cutting brings citations and replanting.
Who to ask: Corps Lake Lanier office
U.S. Army Corps of Engineers (archived page), checked 2026-10-19
File for homestead by Hall’s deadline
Own and live in the home on January 1, then apply by the end of that year’s 45-day appeal window.
Who to ask: Hall County Tax Assessors
Hall County, checked 2026-10-19
File for homestead by Forsyth’s deadline
Forsyth takes applications year-round but sets an April 1 or 45-day-window deadline for each year.
Who to ask: Forsyth County Board of Assessors
Forsyth County, checked 2026-10-19
File for homestead by Dawson’s deadline
Dawson’s Tax Assessor needs applications by April 1 to count for that year.
Who to ask: Dawson County Tax Assessor
Dawson County, checked 2026-10-19
File for homestead by Lumpkin’s deadline
Lumpkin accepts applications up to and including April 1.
Who to ask: Lumpkin County Assessor
Lumpkin County, checked 2026-10-19
File for homestead in Gwinnett
Own and live in the home on January 1; Gwinnett’s deadline is on the assessment notice.
Who to ask: Gwinnett County Assessors
Gwinnett County Tax Commissioner, checked 2026-10-19
Ask an agent about a specific home
This list draws on public sources and is not legal, tax, survey or inspection advice. How long your due-diligence period runs is up to your contract, so check with your agent or closing attorney.
Next step
Compare the six shore areas, browse Lake Lanier homes for sale with a dock or lots for sale, and when one home stands out, contact Gold Peach Realty with the address.
Questions buyers ask
Does a Lake Lanier dock permit transfer when I buy the house?
Dock permits cannot be transferred. They become null and void when the property is sold or transferred, or when the permit holder dies. New owners must tell the Corps of their purchase and apply for a new permit.
Do I own the shoreline on a Lake Lanier lakefront lot?
The U.S. government (the Army Corps of Engineers) owns most of the land around Lake Lanier outright, in fee title. On most 'lakefront' lots the private property line stops at the Corps boundary, not at the water.
How do I find out how the shoreline in front of a lot is zoned?
To learn a lot's shoreline zoning, the 2004 plan points to the allocation map pages at the Corps Operations Manager's office (the plan also cites gis.sam.usace.army.mil). In practice the area ranger confirms it at the required on-site appointment.
What does a buyer send the Corps after closing on a lake home?
For the change-of-owner process the Corps asks for, all at once: the recorded deed with its tax stamp (not a security deed), the current recorded survey or plat with boundary information, your own hand drawing of the dock with all dimensions, a hand-drawn site map, the electrical certification if the permit requires one, and proof of authority for a company, trust, estate, HOA or LLC (and any power of attorney). County aerials, Google maps, the previous owner's drawings and photos are not accepted.
Can I change the dock or clear brush right after I close?
The Corps' welcome letter to buyers says the dock permit expired the day the name on the deed changed, and tells new owners not to install or change facilities or cut vegetation or trees until they contact the office and get written permission.
Can my real estate agent confirm the dock is approved?
The Corps warns buyers ('Buyer be ware!') that a real estate agent has no authority to approve anything about Lake Lanier permits. If the seller or an agent made unapproved changes to the dock or shoreline, the buyer may be required to correct them.
Which counties does Lake Lanier touch?
Lake Lanier's mapped shoreline lies in five Georgia counties: Hall (by far the most), Forsyth, Dawson, Gwinnett (only near Buford Dam) and Lumpkin (only the head of the Chestatee arm).
Source: U.S. Census Bureau TIGERweb
Does a Gainesville mailing address mean the home is in Hall County?
Port Royale Marina has a Gainesville mailing address, but the Census Geocoder places that address in Forsyth County, not Hall. Mailing city is not a guide to county on Lake Lanier.
Source: U.S. Census Bureau Geocoder
Who pays the property tax in the year I buy?
In Georgia, property tax is charged to whoever owned the property on January 1 of the tax year. How a year's tax is split between buyer and seller at closing is a contract and closing matter.
Source: Georgia Dept. of Revenue
How do I check if a lake home is in a flood zone?
FEMA's Flood Map Service Center (msc.fema.gov) is the official public source for National Flood Insurance Program flood hazard information. You can search an address there to find the effective flood map. FEMA says maps are updated over time, so a printed map can be superseded.
Source: FEMA
Rules, rates, maps and lake levels change. Every rule on this page links to the office that sets it; confirm with that office before you rely on it.


